My plan was to dive into PROJECT HOURGLASS by May 1st, but I'm not yet done with PROJECT ROSEWATER or KILLJOY, partly because getting anything built and/or installed in Cairo demands undivided micromanagement.
Kitchen is now a hair away from final-final completion (whenever you think you're done, a new loose thread seems to reveal itself). Renovation on the unit upstairs is finally finished (exceeeept for a minor plumbing thing and some woodwork that needs mending). Today I try to get mirrors installed on a big unfinished wall in the building entrance (the original plan was to create an original mural for it, but I'm learning to take things off my plate when the pile gets too high. and the mirrors will be a good fix).
Other things needed for the studio are: – Closet – Storage Unit for Works on Paper – Shelves and Cabinets for the washroom/storage room – Sofa (in an effort to make my life more difficult, there's a particular design for it I'm looking to get made). – Rocking chair (which will serve as my reading chair—settling into my old age with acceptance). – Side table (to go with said rocking chair—already have the marble slab that will serve as the tabletop, cut out of the kitchen counter to make way for the electric stove top, which means said table will need to be custom-built). – Floor lamp (for the reading/rocking chair) – Additional table on casters (also have a design in mind for it 🙃) – 3 Assorted table lamps – 1 wall-light fixture – Assorted mirrors (to reflect the light around the eerily dark corner of the studio) – 2 floating shelves
And then and only then will I finally feel situated in my new digs. Which puts me at... what? 50 years from now at this rate?